Specialized construction
Building systems, installed with care
Shravan Solar Energy works exclusively on physical system installations: plumbing, heating, air conditioning, and non-electric solar collectors. Every job begins with the plan and ends with equipment that operates as designed.
Field execution
From mechanical plan to working equipment
Our technicians translate installation drawings into finished work on site. Electric, gas, and oil heating systems, furnaces, and cooling towers are set, connected, and tested to the building they serve.
Solar collector work is integrated directly into the plumbing and heating infrastructure already in place, so the system functions as one connected installation rather than a separate add-on.

Operational standards
The installation sequence
01
Plan review
We check the building plans and mechanical requirements before any equipment leaves the truck.
02
Rough-in
Piping, ducting, and connections are run to specification, following the safety requirements that apply to the work.
03
Final placement
Heating and cooling equipment, furnaces, and cooling towers are set in place, connected, and checked for operation.